89
Agilaire 8872 Manual
Chapter 2 Configuration
When you configure the Sub Task and click OK in the pop-up screen the new Task Name
will be added in the Sub Tasks section. The Task Name can be modified.
Select the
Fail Group on Error
column in the
Sub Tasks
section if you want the whole
Task Group to stop running if an error occurs.
Task Type
in the
Sub Tasks
section indicates the sub tasks that are part of one group task.
Click in the
Edit Task
field to make changes in the same pop-up window that came up
when the
Add Sub Task
button was clicked.
To remove a task from the Task Group select the task in the
Sub Task
section and click
the
Delete Selected Sub Task
button.
Task Group (Configuration Editors > Task Scheduler > Add > New Task Group)