CHAPTER 4
NOZZLE CONTROL VALVE
INSTALLATION
HAWKEYE NOZZLE CONTROL VALVE INSTALLATION
After rinsing the debris out of the plumbing, mount the Hawkeye™ nozzle control valves to the existing nozzle
bodies.
BEST PRACTICES AND RECOMMENDATIONS
• Do not connect battery leads until all cables are installed and connected.
• If a dual channel turret nozzle body is installed on the implement, always mount the Hawkeye nozzle control
valve to the straight nozzle port to avoid excessive pressure drop across the nozzle.
• If there are obstacles that interfere with the Hawkeye valve installation it may be necessary to purchase a
different brand of nozzle body with a threaded port on the opposite side.
GENERAL VALVE INSTALLATION
FIGURE 1. Valve Face O-Ring and Nozzle Control Valve
1. Place the supplied o-ring on the inside of the fly nut flush with the valve body face.
NOTE:
If using TeeJet QJS (straight) nozzle bodies, use the green coated (size 115) o-ring. For AGCO Hypro
nozzle bodies, use the green coated (size 115) o-ring. For TeeJet QJ (turret) nozzle bodies, use the
brown/gray (size 116) o-rings.
Valve Body Face O-
Ring
Nozzle
Body
Summary of Contents for RoGator 1100
Page 16: ...CHAPTER 3 12 AGCO RoGator RG900 1100 1300 Hawkeye Installation Manual...
Page 32: ...CHAPTER 5 28 AGCO RoGator RG900 1100 1300 Hawkeye Installation Manual...
Page 37: ...P N 016 0171 588 Rev D 33 CHASSIS CABLE INSTALLATION FIGURE 7 System Diagram Page 1...
Page 44: ...APPENDIX B 40 AGCO RoGator RG900 1100 1300 Hawkeye Installation Manual...