
INSTALLATION
ASSEMBLY SAFETY
CAUTION! TO AVOID PERSONAL INJURY,
READ, UNDERSTAND AND FOLLOW
THE SAFETY INFORMATION
BELOW.
•
Wear personal protective equipment (PPE)
such as, but not limited to, protection for eyes,
lungs, ears, head, hands, and feet when
operating, servicing or repairing equipment.
•
Use lift crane, jack, tackle or fork lift truck to lift
heavy parts and assemblies.
•
Assembly area should be level, clean and free
of debris to prevent assembly personnel from
tripping or falling.
•
Neatly arrange parts and tools within easy
reach of work area.
•
Inspect all parts and tools within easy reach of
work area.
•
Inspect all parts for sharp edges, grease, oil or
dirt which might cause injury during assembly.
•
After completing each assembly step, review
next step in procedure before proceeding with
that step.
•
If machine requires blocking up, use blocking
material of adequate strength and in good
condition. Blocks must be on a smooth, dry,
and level surface.
•
Never place any part of your body under
blocked-up assemblies if at all possible.
•
If welding or flame-cutting is required, be sure
no flammables are in area. Also, clear
bystanders from area.
•
Make sure all fittings are tight and all lines and
hoses are in good condition and not damaged
during installation.
•
Always use a piece of wood or cardboard to
detect fluid leaks. Wear gloves and safety
glasses. Escaping hydraulic fluid, under
extremely high pressure, can penetrate the skin
and cause blood poisoning. If injured by
escaping fluid, see a doctor immediately.
•
Correct fluid leaks before using equipment.
BEFORE DELIVERY
•
After completing assembly of machine, be sure
all nuts, bolts, other fasteners, and hydraulic
fittings are properly tightened.
•
Be sure all safety guards and safety locking
devices are in place.
•
Be sure machine is completely lubricated.
•
Before operating the machine, be sure to read
the OPERATION section of operator’s manual.
•
Before delivering the machine, review machine
maintenance, operation, and safety with the
customer.
9
Summary of Contents for Glencoe DCS3000
Page 2: ......
Page 4: ...NOTES ii...
Page 27: ...INSTALLATION WIRING SCHEMATIC All Models 23 Fig 29 Schematic for DCS 3000...
Page 32: ......
Page 33: ......
Page 34: ......
Page 36: ...Glencoe AGCO CORPORATION 4205 River Green Parkway Duluth Georgia 30096 Printed in U S A...