Cotton Picker Installation
Ag Leader Technology
CaseIH 2055
November 2002
2006200-1
9-18
Figure 18. Header Sensor installed.
7. Connect header sensor cable to distribution cable. Tie up extra cable away from
moving parts.
8. You will have to use the 18-inch header extension cable to reach the distribution
cable properly.
Final Inspection
Installation is now complete. Do a walk around of the cotton picker and complete
the following:
•
All cable connections have been made.
•
Excess cable has been tied out of the way, so there is not interference.
•
All tools have been removed from the cotton picker.
•
All cap screws and carriage bolts are tight.