![AeroWorks 75cc YAK-54 ARF-QB Assembly Manual Download Page 69](http://html1.mh-extra.com/html/aeroworks/75cc-yak-54-arf-qb/75cc-yak-54-arf-qb_assembly-manual_2863257069.webp)
69
19.
Prepare to slide the silicon tubing onto the ny-
lon tie. The split end of the tubing goes oppo-
site the nylon tie lock a shown.
20.
Slide the silicon tubing onto the nylon tie as
shown to form the pipe strap assembly.
21.
Locate the two plywood pipe mounting doub-
lers with pre-installed blind nuts as shown.
22.
Slide the pipe mounting doublers under the
rudder servo mounting tray and align the blind
nuts with the mounting holes as shown.