![AeroWorks 75cc YAK-54 ARF-QB Assembly Manual Download Page 62](http://html1.mh-extra.com/html/aeroworks/75cc-yak-54-arf-qb/75cc-yak-54-arf-qb_assembly-manual_2863257062.webp)
62
29.
Make sure the silicon tubing is underneath the
nylon tie and the nylon tie does not touch the
canister pipe.
30.
Bottom view of the final canister muffler in-
stallation.
Tuned Pipe Installation
1.
Gather the header and tuned pipe parts as
shown below. 1 header, Teflon coupler, 2
steal clamps, and tuned pipe assembly.
2.
Iron the bottom covering to ensure it is tight
and well sealed to the wood of the pipe tun-
nel. Use a hobby knife cut the covering from
the pipe tunnel.