Aeroqual AQM 65 User Guide
Page | 25
Figure 2-4 With mains power on, and with the 12 V DC fuse pulled out, there should be air flow coming
from the top of the AQM as shown on the right. Disconnect the power (red/back) cable from the PM pump
module while testing the power, as shown on the left
Once you have removed the PM power then push in the 12 DC fu
se to the “on” position as shown in
Figure 2-3 on the left.
The green power LED lights should light up on the modules when power is applied, this confirms the
power is being correctly delivered to the modules.
2.2.2 Attach PM inlet
Online
reference
training.aeroqual.com AQM 65 technical training Section 2.4
Online video
https://vimeo.com/119800106
Turn off power to the AQM 65 during this process by pulling out the 12 DC fuse.
The Particle Monitor and Particle Profiler ship from the factory with a thin film of tape which
protects the inlet, this must first be removed as shown in Figure 2-5.
NOTE:
If your AQM 65 has two Particle Monitors as shown in Figure 1-9, the PM10.0 inlet is fitted on
the right side and the PM2.5 is fitted on the left side.