18
Aeroneb
®
Professional Nebulizer System Instruction Manual
Figure 8: Connecting to a neonatal breathing circuit
Figure 9: Alternative neonatal breathing circuit
using neonate T-piece
2. Always perform a leak test of the breathing circuit after
inserting or removing the nebulizer unit. Follow ventilator
manufacturer instructions for performing a leak test.
3. Use the universal mounting bracket to attach the control
module to an IV pole or bed rail in either a vertical or
horizontal orientation (Figure 10 and Figure 11). Do not
over-tighten knob.
Where a standard equipment mount is available, use the
equipment mount adapter to support the control module
(Figure 12).
Neonate T-Piece
Y
From ventilator