RECEIPT AND HANDLING
•
The machine is delivered from the factory
wrapped in estincoil.
•
Before handling the unit, verify the lifting capaci-
ty of the machines used.
•
Handling must be performed by qualified, suita-
bly equipped staff.
HANDLING THE MACHINE:
Whenever the machine must be lifted using belts,
place protections between the belts and the frame-
work to prevent damage to the structure.
LIFTING REGULATIONS
1.
All panels must be tightly fixed before handling
the unit;
2.
Before lifting, check the specific weight on the
technical plate;
3.
Use all, and only, the lifting points indicated;
4.
Use ropes in compliance with Standards and of
equal length;
5.
Use a spacer beam in compliance with Standards
(not included);
6.
Handle the unit with care and without sudden
movements
SELECTION AND PLACE OF INSTALLATION
The Units sent from the factory already inspected and
only requires electric and hydraulic connections in the
place of installation.
Before beginning the installation process, decide with
the customer where the unit is to be installed, whilst
paying attention to the following:
1.
The support surface must be capable of
supporting the unit weight.
2.
The safety distances between the units and other
appliances or structures must be scrupulously
respected.
3.
The unit must be installed by a qualified
technician in compliance with national laws in the
country of destination.
4.
It is mandatory to envision the necessary
technical spaces in order to allow ROUTINE AND
EXTRAORDINARY MAINTENANCE interventions.
5.
Remember that during operation, the chiller
can cause vibrations;
therefore anti-vibration
mounts (ACCESSORIES) are recommended
, which
are fixed to the base according to the assembly
layout.
6.
Fix the unit checking that it is level.
ATTENTION:
•
It is prohibited to stop under the unit during
lifting operations.
•
The units CANNOT
be stacked.
•
The unit must be installed in order to make
possible the maintenance and / or repair.
LIFT THE UNIT
MINIMUM TECHNICAL
ATTENTION:
In windy areas, for correct operation it is
recommended to install a windbreak barrier.
It should be installed if wind velocity is beyond 2.5 m/s.
2.
RECEIPT AND HANDLING
40
ATTENTION
Lifting rods NOT supplied.
ATTENTION:
Diameter of holes Ø
ATTENTION
The unit is delivered fixed on a
pallet. Use forklifts for handling
3000
800
800
800
1100
3000
800
800
800
1100
3000
800
800
800
1100
3000
800
800
800
800
800
800
1100
1100
3000