Operator’s Manual
GTWY SERIES 16
• the lifting techniques used
• the site conditions and weather in which the activity
is being performed (i.e., slippery, icy, raining)
The appropriate number of people and proper lifting
techniques must be used to prevent physical injury.
Loading for Transport
6 Fully lower the platform.
7 Push in the red Emergency Stop buttons, turn the
key switch to the off position and remove the key.
Turn off the circuit breaker. Cut out the power and
fixed the cable.
8 Remove the outriggers from the base and place
them in the storage sockets.
9 DC models: Disconnect the battery cable and
remove the battery pack.
10Inspect the entire machine for loose or unsecured
items.
11Slide the stop bracket to the top lock position.
a. stop bracket b. loading pivot
All models without tilt-back frame
a.stop bracket b.loading pivot
All models with tilt-back frame
1 Hook the loading pivot to the stop bracket.
2 Position the machine flush against the loading
surface. Lower and lock the stop bracket to the
lowest lock pin position above the loading
surface.
3 All models with tilt-back frame:
Be sure both stop bracket lock pins are fully
locked.
Be sure both tilt-back frame swivel casters are
locked.
4 Slide out the T-handle until the lock pin snaps
into place.
5 Lift the T-handle to
tilt the machine onto the
loading surface. Use the
appropriate number of
people and proper lifting
techniques.
12 Carefully push the
machine into transport
position.
13 Return the sliding T-handle
to the stowed position.
14 Secure the machine base and mast to the
transport vehicle. See Securing the Machine
following.
15 Reverse this procedure to unload the
machine.