MFC Series Boilers User Manual
CHAPTER 6 – MFC 3000 DUAL FUEL BURNER
P
OMM-0104_94
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
51
of
170
GF-146
Ph.: 800-526-0288
12/29/2015
Figure 6-26: Maximum Gas Pressure Switch
Burner Startup Sequence of Operation
6.14.8
Sequence of Operation:
•
Operating control closes, the motor starts.
•
The pump (3) in Figure 6-27 draws the fuel from the tank through the piping (1) and pumps it
under pressure for delivery.
•
The piston 4) rises and the fuel returns to the tank through the piping 5) - 7).
•
The screw 6) closes the by-pass heading towards suction and the de-energized solenoid
valves 8) - 9) - 2) close the passage to the nozzle.