Benchmark 2500 - 3000 Boilers
CHAPTER 7 – MAINTENANCE
OMM-0094_0E
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
95
of
204
GF-137
Ph.: 800-526-0288
03/20/2014
Burner Assembly Inspection and Maintenance Procedure (Cont.)
Figure 7-4b: Burner Assembly Mounting Details (BMK 2500 Shown)
Figure 7-5: Bare Burner and Replacement Gaskets Location
3/8”-16
HEX NUTS
(8 each)
5/16” x 1-3/4” BOLTS,
5/16” WASHERS &
NYLOCK NUTS
(4 each)
A/F
VALVE
PLENUM
AIR
FILTER
AIR/FUEL
VALVE
GAS
TRAIN
BLOWER
PLENUM
GAS INLET
PIPE
BLOCKED
INLET
SWITCH
BLOWER
PROOF
SWITCH
BLOWER
MANUAL
SHUT-OFF
VALVE
81173
– UPPER RELEASE GASKET
81180
– MIDDLE BURNER GASKET
81185
– LOWER RELEASE GASKET
BARE
BURNER
INSTALLED
IN HEAT
EXCHANGER
ASSY.
IMPORTANT!
Use ALL THREE gaskets provided, even if there
is only one existing gasket being replaced.
NOTE
The LOWER RELEASE
GASKET (P/N 81185) features
four tabs around its periphery
.