
AM Series Boilers and Water Heaters
CHAPTER 6: INSTALL – VENT & COMBUSTION AIR PIPING
OMM-0100_0D
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
67
of
154
GF-146
Ph.: 800-526-0288
03/28/16
Figure 6-7: Two-Pipe Multi-Unit Air and Vent Sidewall Termination
6.5.14 Sidewall Termination – Concentric Vent
A concentric vent termination must terminate outside the structure and must be installed
as shown in Figure 6-8. The termination opening must be protected from rain, as shown in
Figure 6-9.
Figure 6-8: Concentric Sidewall Termination Clearances