AM Series Boilers and Water Heaters
CHAPTER 6: INSTALL – VENT & COMBUSTION AIR PIPING
Page
64
of
154
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0100_0D
03/28/16
Ph.: 800-526-0288
GF-146
Figure 6-4: Vent Locations and Clearances for Direct Venting
6.5.7 Sidewall Termination - Two pipes
Installation must comply with local requirements and with the National Fuel Gas Code, ANSI
Z223.1 for U.S. installations or CSA B149.1 for Canadian installations.
CAUTION!
A gas vent extending through an exterior wall shall not terminate
adjacent to a wall or below building extensions such as eaves,
parapets, balconies, or decks.
Figure 6-5: Sidewall Termination of Air and Vent Pipes
NOTE
Minimum
clearances to
grade may be
higher depending
on snow line.
If space permits: