Benchmark 750-3000 Boiler Operation, Service, Maintenance Guide - KOREA
SECTION 4 – MAINTENANCE
Page
42
of
144
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0128_0B
07/17/2017
Ph.: 800-526-0288
Igniter-Injector Maintenance Procedure Instructions
Figure 4-3a: BMK 750/1000 Igniter-Injector Orientation
Figure 4-3b: BMK 1500/2000 Igniter-Injector Orientation
Figure 4-3c. BMK 2500/3000 Igniter-Injector Orientation
POSITION
INJECTOR TUBE
INSIDE THIS ARC
IGNITER-INJECTOR
BURNER PLATE
INJECTOR TUBE
BLOWER
POSITION
INJECTOR TUBE
INSIDE THIS ARC
INJECTOR TUBE
IGNITER-INJECTOR
O2 SENSOR
FLAME
DETECTOR
FLAME
OBSERVATION
PORT
POSITION
INJECTOR TUBE
INSIDE THIS ARC
FLAME
OBSERVATION
PORT
INJECTOR TUBE
O2 SENSOR
IGNITER-INJECTOR