
3 0
WWW.AEM-TEST.COM
[email protected] | Version # : 2.2
TestPro CV100
User Manual
Select [Project]/[Profile] on the home screen to create/
edit a project. Once a project is selected, subsequent
Autotest results will be saved in that project.
Select [Project Manager] to choose or create a different
project or to delete an existing project.
Choose from one of the already defined projects or
create a new project by selecting [Add].
•
•
•
Key in a project name and select . .
Click Yes on the dialog box “Do you want to set Multi-
Gig & PoE as current project?
•
•
Choose a profile from the list and click Save. Valid
profiles for TestPro are listed below:
Choose an appropriate profile, eg. [Validation] for multi-
gig validation and select [Save].
•
•
[Validation] for Multi-Gig tests
[Certification] for Copper Cable Certification
[Single Pair Ethernet] for Copper Cable Certification
with less than 4 pairs
[MM Fiber] to Multimode Fiber
[SM Fiber] for Singlemode Fiber
[Network Validation] for Network Autotest
[Coax] for Coax Certification
[Copper 2 Pairs] for Copper Cable Certification
using 2 pairs
a.
b.
c.
d.
e.
f.
g.
h.
To select an already created project, select that from
the [Projects] menu.
will bring you back to the previous screen or
main menu.
•
•
b. Adjusting Test Limits