S
WITCH
I
NSTALLATION
14
6.
Remove the protective plug from the SFP transceiver.
7.
Insert the fiber cable into the transceiver. The connector snaps into place and locks.
Figure 2-5.
Attaching a Fiber Optic Cable to a Transceiver
8.
Repeat the previous procedures to install any additional SFP transceivers in the switch.
The fiber port is now setup.
2.6.2 Removing SFP Modules
To disconnect an LC connector, use the following guidelines:
1.
Press down and hold the locking clips on the upper side of the optic cable.
2.
Pull the optic cable out to release it from the transceiver.
Figure 2-6.
Removing a Fiber Optic Cable to a Transceiver
Do not remove the dust plug from the transceiver if you are not installing the fiber
optic cable at this time. The dust plug protects hardware from dust contamination.
Summary of Contents for EKI-7428G Series
Page 10: ...ix...
Page 11: ...Chapter 1 Product Overview...
Page 17: ...PRODUCT OVERVIEW 6 1 3 Dimensions Figure 1 4 EKI 7428G 4CPI Dimensions 438 22 41 35 426...
Page 19: ...Chapter 2 Switch Installation...
Page 32: ...SWITCH INSTALLATION 21...
Page 33: ...Chapter 3 Configuration Utility...
Page 39: ...Chapter 4 Managing Switch...
Page 159: ...Chapter 5 Troubleshooting...