10
EKI-5729PI & EKI-5624PI User Manual
2.2
Verifying Switch Operation
Before installing the device in a rack or on a wall, power on the switch to verify that
the switch passes the power-on self-test (POST). To connect the cabling to the power
source see “Power Supply Installation” on page 16.
At startup (POST), the System LED blinks green, while the remaining LEDs are a
solid green. Once the switch passes POST self-test, the System LED turns green.
The other LEDs turn off and return to their operating status. If the switch fails POST,
the System LED switches to an amber state.
After a successful self-test, power down the switch and disconnect the power cabling.
The switch is now ready for installation on its final location.
Summary of Contents for EKI-5624PI
Page 1: ...User Manual EKI 5729PI EKI 5624PI ProView Series Ethernet Switches...
Page 10: ...Chapter 1 1 Product Overview...
Page 17: ...Chapter 2 2 Switch Installation...
Page 30: ...Chapter 3 3 Configuration Utility...
Page 40: ...Chapter 4 4 Managing Switch...