
3A5910A
Advanjet HV-9500 Maintenance and Repair
Page 17 of 26
3.2
Install Jet Hammer Cylinder (Continued)
3.2.6
Align the Lever
Use an awl to line up the hole for the pivot (shoulder) bolt with the hole in the lever.
Insert the 5/64” driver from the opposite side and line it up with the awl.
Push out the awl with the driver.
3.2.7
Install the Pivot Bolt
Apply a light coating of Loctite 243 to the threads of the pivot bolt and wipe off any excess.
NOTICE
To prevent damage to the machine, do not allow Loctite from the bolt
tip to transfer to the lever. Do not over-tighten the bolt.
Push out the driver with the pivot bolt.
Screw in the pivot bolt with the driver until
it is barely snug.
Verify that the lever is not binding
—
the hammer cylinder hat should
move up and down freely.
HAT MOVES UP
AND DOWN