72
73
FIG. 21 EXAMPLE OF 4 CONTROLLERS E.G. WITH 100A, LOAD REGU-
LATION CIRCA 30% PARAMETER VALUE OF 4 UNITS: 50, 62, 75, 87
FIG. 22 INTERNAL MAINS LOAD OPTIMIZATION
rent for each power controller.
This procedure enables a slow switching on of the load, e.g. with a slow
cycle time of 1 sec. The values at an interval of 100 lead to a switching
on phase delayed by a cycle period T
0
(group formation). This formation,
for example, allows the activation of an emergency power generator to
be realized.
FIG. 23 THYRO-POWER MANAGER WIRING DIAGRAM
Summary of Contents for THYRO-AX
Page 117: ...118...