background image

GAS REQUIREMENTS: 

18” FIREBOX MODELS 

MODEL 

A (min.) 

 

Key Valve / Switch 

Stub Out 

Ornito 

3’4” 

2’6”  

Santa Fe 

3’10”  

3’0” 

24” FIREBOX MODELS 

MODEL 

A (min.) 

 

Key Valve / Switch 

Stub Out 

Orno 

3’8” 

2’8” 

Santa Fe 

4’2” 

3’2” 

Navajo 

4’8” 

3’2” 

Zuni 

4’8” 

3’2” 

30” FIREBOX MODELS 

MODEL 

A (min.) 

 

Key Valve / Switch 

Stub Out 

Orno 

4’2” 

3’2” 

Santa Fe 

4’4” 

3’4” 

Navajo 

4’10” 

3’4” 

Zuni 

4’10” 

3’4” 

 

The 

1

/

2

” gas stub out should be located at a 

height  of  6”  from  the  floor  and  a  distance 
from the corner specified by 

 in the charts 

below. It should extend no more than  2” to 
3”  from the wall and be capped off until it is 
hooked up to the fireplace. 

 

The  Adobelite  Gas  Log  system  requires 

1

/

2

”  gas  supply  line  capable  of  supplying  an  input  BTU  of  48,000  for    

Natural Gas, and 39,700 for Liquid Propane.

 

STUB OUT 

 

Before  the  Adobelite  firebox  is  installed,  gas  lines  should  be  run  into  the  area  where  the  fireplace  will  be  in‐

stalled. A Keyed Gas Shutoff Valve is required in an accessible location within 3’ of the fireplace. Use figure 

A, 

in 

the charts below to locate the minimum distance from  the corner where the Keyed Gas Shutoff Valve can be 
placed to insure it will not be behind the Adobelite Frame when installed. It should also be at a minimum height 
of 1’8”. 

KEY VALVE 

BTU REQUIREMENTS 

IMPORTANT: 

  All  gas  connections  and  gas  piping  must  be  installed

 

by  a  construction  industry        

licensed  contractor.  Any  permits  and  construction  industry  inspections  required  for  installation 
should be obtained by this contractor. 

 

FIG. 1 ‐ 

GAS SHUTOFF AND STUB OUT 

KEYED GAS  

SHUTOFF VALVE 

1’8” 

6” 

MILLI-VOLT 

WIRES 

ELECTRICAL BOX 

AND SWITCH 

1

/

2

” 

GAS 

STUB-OUT 

1

/

2

” 

GAS SUPPLY 

LINE 

Summary of Contents for KIVA 18 Ornito

Page 1: ...lar steel and diamond mesh frame The frame is finished with stucco after installation C AIR COOLED CHIMNEY Lightweight stainless steel double walled air cooled chimney is used for venting the fireplac...

Page 2: ...2 This page intentionally left blank...

Page 3: ...Manual Combustion Air Intake of fireplace must be kept clear of debris at all times This fireplace is to be installed ONLY by a construction industry licensed contractor Any permits and construction i...

Page 4: ...4 This page intentionally left blank...

Page 5: ...Fireplace Layout 10 11 Fireplace Pedestal 11 2 Firebox Installation 12 Firebox Assembly 12 Door Frame 13 Anchor Plate 13 3 Chimney Installation 14 Installing the Chimney Pipe 14 17 Outside Air Kit In...

Page 6: ...___________ Dealership Purchased at ______________________________________ Dealership Phone __________________________________________ Date Purchased ________________ Date Installed __________________...

Page 7: ...TO COMBUSTIBLES SIDES BACK 1 FACE All framing along firebox face must be non combustible HEARTH EXTENTION 18 CHIMNEY 2 KIVA24 FIREBOX DIMENSIONS TOP VIEW A B C D E F G H I KIVA 24 25 1 4 34 25 44 52 2...

Page 8: ...00 WARNING B Vent Chimney should never be used when solid fuels are to be burned TABLE 1 chimney requirements KIVA30 FIREBOX DIMENSIONS TOP VIEW A B C D E F G H I KIVA 30 30 40 27 1 4 48 1 2 56 1 2 28...

Page 9: ...ural Gas and 39 700 for Liquid Propane STUB OUT Before the Adobelite firebox is installed gas lines should be run into the area where the fireplace will be in stalled A Keyed Gas Shutoff Valve is requ...

Page 10: ...an Electrical Box and Wall Switch or remote control receiver for fireplace control in the wall at the desired location Refer to FIG 1 on page 9 to locate the minimum distance from the corner that the...

Page 11: ...shown in FIG 6 or any other combination of concrete blocks can also be used as long as the overall height is 12 1 Two columns of CMU s should be positioned with the front edge of the blocks against th...

Page 12: ...eces will meet and align the back and sides of the pieces 5 FRONT ARCH Apply refractory mortar to the front edges of the Lower and Upper Back pieces and to the top of the Front Arch sec tion Place the...

Page 13: ...refractory mortar to the top of firebox where the Anchor Plate will sit Align the back edge of the Anchor Plate opening with opening in the firebox top section Secure the Anchor Plate using four dia x...

Page 14: ...The Starter Collar is used to support the outer chimney section while the Anchor Plate collar supports the inner chimney Attach the legs of the Starter Collar to the Anchor Plate with the supplied 12...

Page 15: ...ensions A and E in Layout charts Pages 10 11 Firmly push both the in ner and outer pipes into the Starter Elbow until they snap lock into place 14 RETURN ELBOW Position the Return Elbow so that the ch...

Page 16: ...Firestop Spacers are required at each point where the chimney penetrates a floor or ceil ing joist space Attach Firestop Spacer to joist using wood screws If the chimney pipe passes through a framed o...

Page 17: ...tion air to the firebox therefore not using air from the interior of the house as well as cooling the gas control system 20 4 HOLE FIG 20 1 OUTSIDE AIR VENT EXTERIOR WALL FIG 21 ALUMINUM FLEX DUCT 21...

Page 18: ...UAL IS NOT FOLLOWED EXACTLY A FIRE OR EPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS OF LIFE 22 ATTACHING BURNER PAN AND PILOT Screw the fe male flare fitting on the end of the su...

Page 19: ...g Next cut several strips of diamond lath mesh 16 wide Place the lath strips against the inside Front Arch even with the Door Frame FIG 24 Using 15 8 washer head screws attach the lath to the Front Ar...

Page 20: ...ay not contain sand and cement Many indoor plasters are gypsum based Apply the 2nd coat using a trowel and then smooth out the plaster using water and a float or sponge When complete the 2nd coat will...

Page 21: ...ear the supplied Glowing Embers into dime sized pieces Place the pieces all around the burner holes on top of the burner pan making sure not to cover the burn holes where the gas will come out of See...

Page 22: ...T WHAT TO DO IF YOU SMELL GAS 1 Shut off gas to fireplace 2 Extinguish and flame 3 Go to a phone outside your home and call your gas supplier If you can t reach your gas supplier call the Fire Departm...

Page 23: ...a Frame hearth extension and are available in lengths of 2 to 10 Specify left or rights side when ordering Wood Storage Bin The Wood Storage Bin has an interior size of 24 wide x 12 high x 16 deep It...

Reviews: