
35
5. Steam Damper Air Piston (Flow Control) Operation Adjustment
Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI, steam
damper operation
must be
checked before the dryer is put into operation. Refer to
page 33
for
instructions to check steam damper operation. If steam damper adjustment is necessary, locate the
flow control valve and make the necessary adjustments as noted below.
Summary of Contents for ADE-75
Page 22: ...18...