
11
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap, and/or optional shipping box) from dryer.
IMPORTANT
: Dryer
must be
transported and handled in an upright position at all
times.
The dryer can be moved to its final location while still attached to the skid or with the skid
removed. To un-skid the dryer, locate and remove the four (4) bolts securing the base of the dryer to the wooden
skid. Two (2) are at the rear base (remove the back panel for access), and two (2) are located in the bottom of
the lint chamber. To remove the two (2) bolts located in the lint chamber area, remove the lint door.
With the skid removed, to make it easier to slide the dryer into its final position, slightly lower
ALL
four (4)
leveling legs, so that the dryer will slide on the legs instead of the base frame.
To increase bearing life and improve efficiency, the dryer
should be
tilted slightly to the rear.
The basket (tumbler) is supported during shipping by a wooden block.
REMOVE THIS BLOCK BEFORE
STARTING THE DRYER
.
IMPORTANT
:
For microprocessor (computer) models, this wooden block
must be
removed before connecting power to the dryer or irreparable damage
to the basket (tumbler) will result.
The lint coops of
ALL
AD-75 dryers are supported during shipping by a bracket.
REMOVE THIS BRACKET
BEFORE STARTING THE DRYER
.
1. LEVELING DRYER
The dryer is equipped with four (4) leveling legs, one at each corner of the base. Two (2) are
located at the rear of the dryer base, and two (2) are located in the lint chamber (coop).
To
increase bearing life and improve efficiency, the dryer should be tilted slightly to the rear.
Summary of Contents for ADE-75
Page 22: ...18...