
23
Actual electrical wire connections are made to the L1 and L2 terminals of the motor contactor located in
the rear service box mentioned above. The ground connection is also made to the copper lug also pro-
vided in this box.
If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/pigtail
(wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker
panel. In both cases, a strain relief
must be
installed where the wiring enters the dryer.
2) 3 Phase (3 Ø) Wiring Connections / Hookup "NON-REVERSING MODELS ONLY"
The electrical connections on ALL three-phase (3 Ø) gas and steam dryers are made into the rear service
box located at the upper left area of the dryer. Electrical connections for electrically heated dryers are
made in the electric oven area located at the upper rear area of the dryer.
NOTE
:
A CIRCUIT SERVING EACH DRYER
MUST BE
PROVIDED.
If local codes permit, power to a gas or steam dryer can be made by the use of a flexible U.L. listed power
cord/pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the
service breaker panel. In all cases, a strain relief
must be
installed where the wiring enters the dryer.
6LQJOH3KDVH(OHFWULFDO&RQQHFWLRQV/HDGV
%ODFN
3RVLWLYH
:KLWH
1HXWUDO
*UHHQ
*URXQG
RU
/
Summary of Contents for ADE-75
Page 22: ...18...