en
15
Prestige Box: A1004849 - 664Y7100 • A
EN
FR
NL
ES
IT
DE
PL
RU
STARTING UP
STARTING UP THE SYSTEM
Set-up conditions
•
All connections made
•
Electrical power supply on
•
Gas supply open
•
Hydraulic circuit full of water
Procedure
1.
Check that there is no gas leak.
2.
Push in the ON/OFF master switch ( ) of the boiler(s).
3.
Refer to the Prestige Solo Installation, Operation and Maintenance manual, and to the “Cascade” Volume
of the Installer’s Handbook.
Follow-on tasks
1.
Check that there are no leaks.
Summary of Contents for Prestige Box 200 LP
Page 3: ...Addendum Nox Values A1007428 ADD0170...
Page 13: ...Addendum Prestige Chimney Connections A1005389 ADD0070...
Page 14: ...Addendum Prestige Chimney Connections A1005389 ADD0070...
Page 31: ...Prestige Box A1004849 664Y7100 A en 18 EN FR NL ES IT DE PL RU DECLARATION OF CONFORMITY...
Page 32: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A EN FR NL ES IT DE PL RU en 19...
Page 33: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A en 20 EN FR NL ES IT DE PL RU...
Page 34: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A EN FR NL ES IT DE PL RU en 21...
Page 35: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A en 22 EN FR NL ES IT DE PL RU...
Page 36: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A EN FR NL ES IT DE PL RU en 23...
Page 37: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A en 24 EN FR NL ES IT DE PL RU...