Prestige Box: A1004849 - 664Y7100 • A
en
16
EN
FR
NL
ES
IT
DE
PL
RU
MAINTENANCE
SHUTTING DOWN THE SYSTEM
1.
Switch the boilers off using the ON/OFF master switch and isolate the external power supply.
2.
Close the gas supply valve of the appliance.
SAFETY INSTRUCTIONS FOR MAINTENANCE
Essential recommendation for the electrical safety
• Isolate the external power supply of the appliance before performing any operation,
unless it is required to take measurements or perform system setup.
Essential recommendations for safety
• Water flowing out of the drain valve may be extremely hot and could cause severe
scalding.
• Check the tightness of the flue pipe connections.
Essential recommendations for the correct operation of the appliance
• It is recommended to have the appliance and the burner(s) serviced at least once a
year or every 1,500 hours. More frequent servicing may be required depending on the
appliance use. Please consult your installer for advice.
• The boiler and burner maintenance will be carried out by a qualified engineer, and
the defective parts may only be replaced by genuine factory parts. Refer to the boiler
installation, Operation and Maintenance manual for the correct procedures.
• Control the tightness of the hydraulic circuit connections.
• Make sure to replace the gaskets of the removed items before reinstalling them.
DRAINING THE HEATING CIRCUIT
1
2
3
1
Essential recommendations for safety
• If an external DHW tank is installed in the system, make sure to drain the heating
(primary) circuit or bring its pressure to 0 bar before draining the DHW tank.
• Water flowing out of the drain valve may be extremely hot and could cause severe
scalding. Keep people away from the hot water discharge.
Set-up conditions
•
Boiler(s) switched off using the ON/OFF master switch
•
External power supply isolated
•
Gas supply closed
Heating circuit draining procedure
1.
Close the isolating valves (
1
).
2.
Connect the drain valve (
2
) to the sewer with a hose.
3.
Open the 3-way valve (
3
) (in vertical position) to empty the circuit and allow air to enter.
4.
Open the drain valve (
2
) to finish emptying the heating circuit of the boiler.
5.
Close the drain valve (
2
) and the 3-way valve (
3
) once the heating circuit of the boiler is empty.
Summary of Contents for Prestige Box 200 LP
Page 3: ...Addendum Nox Values A1007428 ADD0170...
Page 13: ...Addendum Prestige Chimney Connections A1005389 ADD0070...
Page 14: ...Addendum Prestige Chimney Connections A1005389 ADD0070...
Page 31: ...Prestige Box A1004849 664Y7100 A en 18 EN FR NL ES IT DE PL RU DECLARATION OF CONFORMITY...
Page 32: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A EN FR NL ES IT DE PL RU en 19...
Page 33: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A en 20 EN FR NL ES IT DE PL RU...
Page 34: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A EN FR NL ES IT DE PL RU en 21...
Page 35: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A en 22 EN FR NL ES IT DE PL RU...
Page 36: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A EN FR NL ES IT DE PL RU en 23...
Page 37: ...PRESTIGE 42 50 75 100 120 Solo A1004849 664Y7100 A en 24 EN FR NL ES IT DE PL RU...