© Copyright 2011 Acnodes, Inc.
All rights reserved. Product description and product specifications
are subject to change without notice. For latest product information,
please visit Acnodes’ web site at www.acnodes.com.
PC 5150
15-inch touch panel PC
8
RMC 7152
14” short depth server
14628 Central Blvd,
Chino, CA91710
tel:909.597.7588, fax:909.597.1939
CHAPTER 2
2.1 Overview
This chapter provides a quick setup checklist to get your RMC 7152 up and running. FOllowing the steps in the order given
should enable you to have the system operational within a minimal amount of time. This quick setup assumes that your
system has come to you with the processor and memory preinstalled. If your system is not already fully integrated with a
serverboard, processor, system memory etc., please turn to the chapter or section noted in each step for details on installing
specific components.
2.2 Unpacking the System
You should inspect the box the server was shipped in and note if it was damaged in any way. If the server itself shows
damage, you should file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the server. It should be situated in a clean, dust-free area that is
well ventilated. Avoid areas where heat, electrical nose and electromagnetic fields are generated. You will also need it placed
near a grounded power outlet. Read the rack and server precations in the next section.
2.2 Preparing for Setup
The RMC 7152 does not ship with a rack rail hardware package as the system can be rack mounted without the use of rails.
An optional rack rail package is available if you wish to order from Acnodes. Follow the steps in the order given to complete
the installation process in a minimal amount of time. Please read this section in its entirety before you begin the installation
procdeure outlined in the sections that follow.