System Housing
0-19
Installing the Power Supply Modules
1.
After you have removed all the screws that secure the existing
power supply module to the lower bay, carefully move the
module to the upper power supply bay.
2.
When in place, secure the first power supply with screws.
3.
Get the second redundant power supply ready.
4.
Firmly hold the power supply and align it to the lower bay.
5.
When in place, secure the second power supply with screws.
6.
Reinstall the right door but do not close it completely.
Summary of Contents for Veriton 9100
Page 1: ... FHU OWRV System Guide ...
Page 41: ...0 28 Altos 9100B System Guide Connecting External Devices Connecting a Monitor ...
Page 42: ...System Housing 0 29 Connecting a Keyboard ...
Page 43: ...0 30 Altos 9100B System Guide Connecting a Mouse ...
Page 44: ...System Housing 0 31 Connecting a Printer ...
Page 45: ...0 32 Altos 9100B System Guide Complete System Connections ...
Page 79: ...CPU Board 2 15 4 When you have released both clips take off the processor heatsink and fan ...
Page 131: ...LCD Module Event Log List A 1 ...