41
11
(1) Extract the white lamp wire in
the lamp box and disassemble
the screw*1(M3*L6) connecting
the lamp module in the machine,
then take off the lamp
module.(Figure1)
(2) Dismantle the screws*2
(M3*L6) of the BKT in the neck of
the engine and take off the
BKT.(Figure2)
screw
driver
12
(1) Disassemble the screws*3
(M2.5*L10), then take off the
engine.(Figure1)
(2) Disassemble the screws*2
(M3*L8), and take off BKT under
the engine.(Figure2)
(3) Take off the ballast mylar.
(Figure 3)
screw
driver
13
(1) Extract all the wire in the
ballast and dismantle the
screws*2(M3*L6), then take off
the ballast.(Figure1)
(2) Dismantle screws*2 (M3*L6)
connecting the blower with the
machine and take off the the
blower.(Figure2)
(3) Dismantle screws*3 (M3*L8)
connecting the lamp box with the
machine and take off the
lampbox.(Figure3)
screw
driver
Figure 1
screw
lamp wire
1
2
Figure 2
2
1
3
Figure 1
Figure 2
1
2
1
2
3
2
1
Figure1
Figure2
Figure3
Note:
Circuit boards > 10cm
2
has been highlighted with the yellow
rectangle as above image shows. Please detach the Circuit boards
and follow local regulations for disposal.
Figure 3
Summary of Contents for S5201M Series
Page 17: ...17 System Block Diagram ...
Page 18: ...18 Product Overview ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 47: ...47 Fig 3 4 Fig 3 5 Fig 3 6 Fig 3 7 Fig 3 8 Clip UP CM Sponge AL Screw MYLAR CM ...
Page 59: ...59 Inlet Case Module Fan FAN60 60 13 fan wire direction Outlet Case Module ...
Page 68: ...68 Attach mylar on UC align this edge First Second M3 screw ...
Page 70: ...70 9 Overall wire review Notice lamp wire dressing ...
Page 87: ...87 Chapter 5 FRU List Exploded Diagram Module 1 Total Exploded View ...
Page 88: ...88 ...
Page 89: ...89 Module 2 ASSY UPPER CASE ...
Page 90: ...90 Module 3 ASSY LOWER CASE ...
Page 91: ...91 Module 4 ASSY FRONT CASE ...