![Acer Altos R5250 Series User Manual Download Page 47](http://html.mh-extra.com/html/acer/altos-r5250-series/altos-r5250-series_user-manual_8205047.webp)
29
Opening the server
Caution!
Before you proceed, make sure that you have turned
off the system and all peripherals connected to it. Read the
“Pre-installation instructions” on page 28.
You need to open the server before you can install additional
components. The front bezel and top cover are removable to allow
access to the system’s internal components. Refer to the following
sections for instructions.
Removing and installing the front bezel
To remove the front bezel:
Grasp the front bezel at the outer edge and pull it straight out.
Summary of Contents for Altos R5250 Series
Page 1: ...Acer Altos R5250 Series User s Guide ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 35: ...2 System setup ...
Page 43: ...3 System upgrade ...
Page 75: ...4SystemBIOS ...
Page 103: ...5 System troubleshooting ...
Page 114: ...5 System troubleshooting 96 ...
Page 115: ...Appendix A Server management tools ...
Page 124: ...Appendix A Server management tools 106 ...
Page 125: ...Appendix B Rack mount configuration ...
Page 126: ...This appendix shows you how to set up the Altos R5250 server in a rack mount configuration ...
Page 134: ...Appendix B Rack mount configuration 116 6 Fully extend the mounting rails on the rack ...
Page 138: ...Appendix B Rack mount configuration 120 ...
Page 142: ...124 ...