![Acer Altos R5250 Series User Manual Download Page 37](http://html.mh-extra.com/html/acer/altos-r5250-series/altos-r5250-series_user-manual_8205037.webp)
19
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
•
Near a grounded power outlet
•
Clean and dust-free
•
Stable surface free from vibration
•
Well-ventilated and away from sources of heat
•
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•
Acer Altos R5250 server system
•
Acer EasyBUILD
TM
•
Acer Altos R5250 accessory box
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
Summary of Contents for Altos R5250 Series
Page 1: ...Acer Altos R5250 Series User s Guide ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 35: ...2 System setup ...
Page 43: ...3 System upgrade ...
Page 75: ...4SystemBIOS ...
Page 103: ...5 System troubleshooting ...
Page 114: ...5 System troubleshooting 96 ...
Page 115: ...Appendix A Server management tools ...
Page 124: ...Appendix A Server management tools 106 ...
Page 125: ...Appendix B Rack mount configuration ...
Page 126: ...This appendix shows you how to set up the Altos R5250 server in a rack mount configuration ...
Page 134: ...Appendix B Rack mount configuration 116 6 Fully extend the mounting rails on the rack ...
Page 138: ...Appendix B Rack mount configuration 120 ...
Page 142: ...124 ...