63
9
Remove the new lithium battery from its package, and, being
careful to observe the correct polarity, insert it in the battery
socket.
10 Reconnect or replace any internal components you needed to
disconnect or remove.
11 Replace the server’s cover. Reconnect any external components
you needed to disconnect.
12 Attach the AC power cord.
13 Run Setup to restore the configuration settings to the RTC.
WARNING!
Danger of explosion if battery is incorrectly replaced.
Replace only with the same or equivalent type recommended by
the equipment manufacturer. Discard used batteries according to
manufacturer’s instructions.
BB!H631!.!FO/cppl!!Qbhf!74!!Uvftebz-!Bvhvtu!28-!3115!!5;13!QN
Summary of Contents for Altos G520 series
Page 1: ...Acer Altos G520 series User s guide ...
Page 11: ...1 System tour ...
Page 29: ...19 2 SATA cable connector 3 HDD backplane power connector 10pin Label Description ...
Page 30: ...1 System tour 20 ...
Page 31: ...2 System setup ...
Page 44: ...2 System setup 34 ...
Page 45: ...3 Upgrading the system ...
Page 79: ...4 BIOS setup ...
Page 131: ...Appendix A Troubleshooting ...
Page 145: ...Appendix B ASM Quick Installation Guide ...
Page 146: ...This appendix shows you how to install the ASM software package ...
Page 149: ...Appendix C Altos G520 Rack Installation Guide ...
Page 150: ...This appendix shows you how to install the optional rack mount kit for Acer Altos G520 ...
Page 157: ...Appendix D SATA RAID Configuration ...
Page 158: ...This appendix shows you how to create SATA RAID ...
Page 162: ...Appendix D SATA RAID Configuration 152 ...
Page 163: ...Appendix E RAID Configuration ...
Page 164: ...This appendix shows you how to create RAID ...
Page 169: ...Appendix F Diagnostic Code Checkpoints ...