38
AcuRe
v
1300
of the thermal demand table. Set 1-30min as a calculate cycle. In the whole cycle, we just
need to calculate the demand once. Which means the demand update time is equal to the
demand calculate cycle. In this method, in the operation state demand calculation method
is displayed to block.
4) Sealing option
Choose the “meter clock + time of use”, the corresponding content(meter clock, TOU
parameters, Daylight saving time parameters) can be sealed.(the change of corresponding
time must proceed when the seal is open.)
5) Communication permission
Divided into low permission and high permission.
Low permission: important operation (like clear demand event record, programming
event record, open cover event record, meter data, energy data initial energy data)
disabled. But it can update to high permission through updating the communication
permission.
High permission: The communication supports all functions. 30 min after updating to
the high permission, the meter would lower its permission to low permission automatically,
to keep the meter’s safety.
6) Display scan parameters
Users could add data to the display scan parameters through the PC tools software.
The meter would cycling display the elected content.
Summary of Contents for AcuRev 1300
Page 1: ...User s Manual AcuRev 1300 3P4W Energy Meter...
Page 2: ......
Page 8: ...VI AcuRev 1300...
Page 30: ...22 AcuRev 1300...
Page 41: ...33 AcuRev 1300...
Page 42: ...34 AcuRev 1300...
Page 112: ...104 AcuRev 1300...
Page 119: ...111 AcuRev 1300...