Maintenance 7
3.2 Outdoor Unit
Evacuation for the whole system
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
56+4
)259+
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
5VKT
2U
.O
<GI[[SV[SV
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the vacuum pump to the 3-way valve’s
service port.
3.
Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4.
Close the valve (Low side) on the charge set and turn
off the vacuum pump.
5.
Wait for 5 minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
6.
Disconnect the charge hose from the vacuum pump.
7.
Mount the caps of service port and 2- and 3-way
valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m.
Summary of Contents for COLONNA CLN130R
Page 3: ......
Page 6: ......
Page 7: ...Contents 1 Precautions 2 2 Information servicing For flammable materials 3 Safety Precautions...
Page 19: ...Specifications 7...
Page 20: ...Outdoor unit printed circuit board diagram 17122000041841 Specifications 8...
Page 22: ...Outdoor unit DC motor driver board diagram 17122000021912 5 6 1 2 3 4 Specifications 10...
Page 41: ...Indoor Unit Disassembly 2 1 Dimension...
Page 57: ...Outdoor Unit Disassembly 3 2 Dimension UECS130R...
Page 100: ...For some models 33...