Using a pencil and plumb line
(alternatively a stanchion as a line and
a level or a very long level can be
used), mark the position of the upper
and lower holes for the stanchions just
positioned (Fig. 17 e Fig. 18) that
correspond to the V notches on the rail.
The notches are on both parts of the
rail.
Fig. 17 – Various methods of marking the holes
Caution!
The holes must be properly aligned on the vertical.
At this point the 8.5 mm holes can be
drilled where the marks had just been
made.
Continue as above for the remaining
stanchions.
Fig. 18 – Detail of drilling hole marks
Summary of Contents for RPSP
Page 1: ...Supra Linea Inclined Platform Lift Installation Manual INS RPSP EN 05 ...
Page 6: ...5 Installation Manual RPSP INS RPSP EN 05 Fig 2 General exploded view ...
Page 7: ...6 Installation Manual RPSP INS RPSP EN 05 Fig 3 Register exploded view ...
Page 8: ...7 Installation Manual RPSP INS RPSP EN 05 Fig 4 View of the guide ...
Page 9: ...8 Installation Manual RPSP INS RPSP EN 05 Fig 5 Machine body ...
Page 11: ...10 Installation Manual RPSP INS RPSP EN 05 Fig 7 Platform Fig 8 Lateral Motorized Flap SML ...
Page 12: ...11 Installation Manual RPSP INS RPSP EN 05 Fig 9 Frame crush proofing Fig 10 Anti impact ...
Page 14: ...13 Installation Manual RPSP INS RPSP EN 05 Fig 12 Three phase electrical motor connections ...
Page 57: ...56 Installation Manual RPSP INS RPSP EN 05 ...
Page 58: ...57 Installation Manual RPSP INS RPSP EN 05 ...
Page 60: ......