80 Bays SAS to SAS/SATA JBOD Subsystem
User Manual
33
7.
Install the other end of rail assembly to the left front side. To install, align and
insert the 2 latches of the rail into the 2 holes on the rack post. Use the Lock
Lever to lock the rail assembly in the left rack post.
View from Rear Side of Front Left Rack Post
2 Latches are inserted in the 4
th
and 6
th
holes from bottom (M5 nut)
View from Front Side of
Front Left Rack Post
Lock Lever is Not Locked
View from Front Side of
Front Left Rack Post
Lock Lever is Locked
Lower
M5 Nut
Lock
6
th
5
th
4
th
3
rd
2
nd
1
st
2 Latches
Lower
M5 nut
Lock
Lever
Lock
Lever
Lower
M5 nut