background image

Absco Industries

Assembly Instruction Manual

ABSCO SIGNATURE GAZEBO

MODEL: ADGAZEBO33

3.11m W x 3.11m D x 2.60m H

Model: ADGAZEBO33

21/09/23

1.00

1  

 

 

AU: 1800 029 701

N Z: 0800 466 444

[email protected]

www.abscosheds.com.au

2

^

 fall 

to rear

o

FRONT

For construction in non-cyclonic areas

Wind rating: N3 as per AS4055-2021.
If you require a higher wind rating please contact 
us: [email protected] or 1800 029 701

NOTE - Concrete slab must be a minimum of 
100mm thick, 20 MPa concrete reinforced with 
SL72 mesh and extend for the full area covered by 
the structure.

3110 mm

3115 mm

3014 mm

2585 mm

3014 mm

Summary of Contents for SIGNATURE ADGAZEBO33

Page 1: ...u www abscosheds com au 2 fall to rear o FRONT For construction in non cyclonic areas Wind rating N3 as per AS4055 2021 If you require a higher wind rating please contact us admin absco com au or 1800...

Page 2: ...n detail to gain a thorough understanding of assembly methods and associated details Unpack and carefully identify and check off all the parts against the parts described and illustrated on Components...

Page 3: ...K TR35 3020 mm 3115 mm Downpipe 80 mm RWG 21 1 QTY CHECK 2925 mm 2680 m m 3045 m m 3140 mm 3105 mm 1 QTY CHECK TU 8 QTY CHECK BK3 1 QTY CHECK 1 QTY CHECK 1 QTY CHECK 2 QTY CHECK 2 QTY CHECK 100 QTY CH...

Page 4: ...post 2 Fasten using four FAST100 tek screws and 5 16 nut setter Make sure screws are inset 20 mm from the edges of bracket for beam clearance To keep the parts aligned while fastening use a clamp or...

Page 5: ...nchors using the post baseplate as a template Use a hammer drill with a 12mm diameter masonry drill bit drill to a depth of 100mm Fasten to foundations with four concrete screws FAST103 per post using...

Page 6: ...K3 as shown 5 Make sure the ends of the beam are as far as they can go into the brackets there will be a small gap at the top for the front due to angle Fasten each end with four FAST100 tek screws as...

Page 7: ...nel 4 Safely position the first panel on top of the frame all the way to the left The steel top skin will sit over the rear flashing 5 Adjust so it s butted up against the rear trim and the side of th...

Page 8: ...skin male female features align TOP VIEW Fastening layout 7 Fasten roof panels to beams with a tek 14 x 125 mm FAST104 at the remaining positions NOTE pan fixed to centreline of beam unless noted othe...

Page 9: ...e side of roof panel Bent tab hard up against front Top face sits on two sheet ribs Bottom face covers the rear flashing 15 90 o SIDE FLASHING REAR DETAIL 0 TR36 flashing will overhang roof panel at t...

Page 10: ...DE VIEW 1 At the front take an outside measurement from the left to the right flashing Trim the front flashing TR37 to this length 2 Cover the front edge of the roof and flashings Carefully lift over...

Page 11: ...im away area shown in grey with tinsnips Repeat steps at the other end to make the other end stop 3 At the rear of the structure take an outside measurement from the left to the right flashing Trim th...

Page 12: ...mark onto the rear beam at the point shown 8 Take a string line and make a line from the high to low point this is for the two middle brackets 9 Align the bottom of the gutter bracket with the marks a...

Page 13: ...ten and damage Predrilling may be helpful 3 Cut the downpipe to length 4 Place the dropper RWG22 into the top of the downpipe and fasten and seal press into clips and slide up until it touches the und...

Page 14: ...art 0 General Principles AS NZS 1170 1 2002 Structural Design Actions Part 1 Permanent Imposed Other Actions AS NZS 1170 2 2021 Structural Design Actions Part 2 Wind Actions AS NZS 1170 3 2003 Design...

Reviews: