GENERAL INSTRUCTIONS
A NOTE ON SAFETY
·
Local council approval must be obtained prior to construction of the carport. Once
you have selected your site you will need to create and lodge a site plan to your
local council or certifier. You will also have to attach a copy of the engineering
drawings at the back of these instructions to your site plan.
·
The site for the carport must be level, refer to concrete and foundation notes on
engineers drawing 06205-003-CP03.
·
Before commencing any assembly, read through these instructions and engineers
drawings in detail to gain a thorough understanding of assembly methods and
associated details.
·
Some components have been pre-punched. Some 10mm holes will still have to be
drilled. It may be easier to drill a small pilot hole first.
·
Measure, and check off all components using the parts lists on the following pages
prior to commencement. To prevent damage in transit, some components may be
packed inside others, almost hidden. Carefully examine inside each component to
ensure that you have located every item. If a discrepancy is found, contact Absco
industries immediately.
·
Some parts may have sharp edges. It is advisable to wear gloves when handling these
items and safety glasses if drilling holes. Sensible shoes are highly recommended.
·
It is highly recommended to erect the carport with at least two or more people.
TOOLS REQUIRED
SITE PREPARATION
10mm DRILL BIT AND
MASONRY DRILL BIT
·
SPIRIT LEVEL
·
SPANNERS
·
10mm MASONARY DRILL BIT
·
TAPE MEASURE
·
CLAMP OR VICE GRIPS
·
HACKSAW
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION MANUAL
CARPORT MODEL: CPDW50
10-05-2017
Absco Industries
Skillion Carport Model: CPDW50
PAGE 02