What You See on the Display
What You Do
Comments
7-2
Questions?
Refer to Page 10-9 For Technical Support Instructions.
Chapter 7: Linearity Test
5.
Scan or manually enter the CVC kit lot
number via the keypad, then press
Enter
.
LIN stands for Linearity.
6.
If the
New Panel
screen appears you
may either:
Press
1
–
ReEnter Kit Lot
.
Press
2
–
Replace Panel
.
If the CVC kit lot number that was entered is
different from the previous one, the monitor
will prompt you to do one of two actions:
Either re-enter the existing lot number or
replace the existing lot number with the new
lot number.
7.
Select the number of the level of the next
test to be run. If you press
6
for a
New
Panel
, the monitor will prompt you to
confirm that you wish to replace the
existing panel.
There can be up to 4 replicates per level.
The number in the parentheses indicates
the number of replicates already run for that
level. When a level is full, the number 4 will
appear in parentheses, indicating that all four
replicates have been completed for this level.
For example
1 - Level 1(4)
.