![ABB UCC Series Installation And Commissioning Manual Download Page 7](http://html.mh-extra.com/html/abb/ucc-series/ucc-series_installation-and-commissioning-manual_3710007.webp)
7
Contents
1
Introduction ____________________________________________
9
1.1
Type Designation ________________________________________
10
1.2
Required Tools __________________________________________
13
1.3
Required Material _______________________________________
13
1.4
Oil ___________________________________________________
14
1.5Oil Conservator _________________________________________
14
1.6
Oil Filter Unit for Continuous Oil Filtration ___________________
15
1.7
Weights _______________________________________________
15
1.8
Tightening Torque _______________________________________
17
2
Receiving ______________________________________________
17
2.1
Unpacking _____________________________________________
17
2.2
Inspection on Receipt _____________________________________
17
2.3
Temporary Storage before Assembly _________________________
17
3
Installation in the Transformer ______________________________
18
3.1
Cover-Mounting _________________________________________
19
3.1.1 UCC with Tap Selector size IV _____________________________
19
3.1.2 UCD with Tap Selector size III _____________________________
23
3.1.3 UCD with Tap Selector size G _____________________________
26
3.2
Yoke-Mounting _________________________________________
33
3.2.1 Mounting when the Transformer Ratio Measurement
is carried out before Drying ________________________________
34
3.2.2 Mounting when the Transformer Ratio Measurement
is carried out after Drying _________________________________
36
3.2.3 Mounting on Transformer Cover ____________________________
37
3.3
Connection to Terminals __________________________________
40
3.4
Transformer Ratio Measurement ____________________________
42
3.4.1 Transformer Ratio Measurement before Drying ________________
43
3.4.2 Transformer Ratio Measurement after Drying__________________
43
4
Drying ________________________________________________
44
4.1
Observations before Processing _____________________________
44
4.2
Observations after Processing ______________________________
44
4.3
Installation of Diverter Switch ______________________________
45
5Final Assembly _________________________________________
49
5.1
Mounting of the Motor-Drive Mechanism _____________________
49
5.2
Mounting of External Drive Shafts __________________________
51
5.2.1 Mounting of Vertical Drive Shaft ___________________________
53
5.2.2 Mounting of Horizontal Drive Shaft _________________________
55
5.2.3 Before Operation ________________________________________
57
5.3
Pressure Relay __________________________________________
58
5.3.1 General ________________________________________________
58
5.3.2 Installation _____________________________________________
58
5.3.3 Checking at Commissioning of the Transformer ________________
59
5.4
Assembly of Accessories __________________________________
59
5.5
Connection to the Oil Conservator ___________________________
60