6.3 Filling at Atmospheric Pressure
1. Open the conservator valve, if any.
2. Dismantle the breathing device on the conservator for the on-load tap-changer.
3. Pump oil into the diverter switch housing via the oil valve (connection dimensions,
see the dimension drawing for the on-load tap-changer). Continue until the conser-
vator is filled to the correct level at the actual temperature. See even section 1.5.
4. Shut the oil valve and disconnect the pump.
5. Remount the breathing device. Make sure the connection to the breathing device is
properly sealed.
CAUTION
Do not energize the transformer earlier than three hours after oil filling in
atmospheric pressure. This waiting period is needed to allow air bubbles to
disappear.
6.4 Filling under Vacuum
Filling under vacuum is not necessary but may be carried out with some of the
following procedures. After filling under vacuum, no standing time is needed. The
methods below ensure that no permitted pressure differencies are exceeded.
6Oil Filling
62
Oil
OLTC
Fig. 46. Oil filling at vacuum
Fig. 45.
Stud M10
Transformer
Vacuum
Pipe connection
Connection flanges for the oil-
conservator. The pressure relay
can have the alternative placement
Ø 5.7
O-ring
Ø 20
Ø 7
5
Ø 44.2
Flange for gas
operated relay
(transformer tank)
TC_00155
Cover with air
release valve