![ABB Terra AC Installation Manual Download Page 35](http://html.mh-extra.com/html/abb/terra-ac/terra-ac_installation-manual_346035.webp)
5
Site preparation
5.1
Select the site
1. Find a suitable site on a wall. For the specifications of the wall, refer to section
2. Make sure that the correct power supply is available. For the power supply
specifications, refer to section
.
3. Obey the space requirements. Refer to section
.
5.2
Prepare the site (IEC portfolio)
Preliminary requirements
1.
The site must be suitable to install the EVSE. Refer to section
.
Note:
Information for MID certified EVSE:
•
The meter is intended to be installed in a Mechanical Environment
'M1', with Shock and Vibrations of low significance, as per 2014/32/
EU Directive.
•
The meter is intended to be installed in Electromagnetic Environment
'E2', as per 2014/32/EU Directive.
Procedure
1. Make sure that the space and the airflow around the EVSE are sufficient. Refer
.
2. Make sure that the correct cables are available at the site.
•
AC input cable. Refer to section
•
•
Ethernet cable. Refer to section
5.3
Prepare the site (UL portfolio)
Preliminary requirements
1.
The site must be suitable to install the EVSE. Refer to section
.
Procedure
1. Make sure that the space and the airflow around the EVSE are sufficient. Refer
.
2. Make sure that the correct cables are available at the site.
•
AC input cable. Refer to section
•
•
Ethernet cable. Refer to section
Site preparation
BCM.V3Y01.0-EN | 002
35