![ABB Terra AC Installation Manual Download Page 47](http://html.mh-extra.com/html/abb/terra-ac/terra-ac_installation-manual_346047.webp)
Procedure
1. Get access to the EV charge cable
connection:
a. Remove the cabinet cover. Refer to
.
b. Remove the inner cover. Refer to
2. Disconnect the EV charger 2-pin
connector (A) that is receptacle to the
CP/PP connector.
3. Loosen the screws (B) on the terminal
block output connector (C).
4. Disconnect the wires:
•
L2 (D)
•
Earthing (grounding) wire (E)
•
L1 (F)
5. Remove the EV charge cable.
6. Connect the new EV charge cable:
a. Connect the wires.
b. Tighten the screws (B) to the correct torque. For the specification, refer to
c. Connect the EV charger 2-pin connector that is receptacle to the CP/PP
connector.
7. Prepare for operation:
a. Install the inner cover. Refer to section
b. Install the cabinet cover. Refer to section
C
D
E
F
B
A
Electrical installation
BCM.V3Y01.0-EN | 002
47