
20
WARNING
The operations described in this chapter require specialized knowledge, and
sometimes involve the necessity of working on the sample gas feed unit with
its cover open and live. They must therefore only be carried out by qualified
and specially trained persons.
Replacing the Condensate Pump Hose
When does the hose need to be replaced?
Depending on the operating cycle, the condensate pump hose should be replaced
at least every 5 months.
NOTE
Use only an original pump hose as replacement part to ensure trouble-free
operation. Never lubricate the condensate pump hose.
WARNING
Residues from the condensate that the pump has been feeding may be found
in the pump hose and the connected hoses. These media can flow out when
the hose connections are opened. Take appropriate measures where needed to
collect such residues. The medium being fed may be corrosive and poisonous!
Appropriate precautions must be taken! Wear protective goggles and
protective clothing!
Condensate pump, hose and pump head with roller mounting
1
Moving belt
3
Hose
5
Pressure rollers
2
S-clip
4
Hose connections
6
Dovetail guides
C
H A P T E R
5
Maintenance
Summary of Contents for SCC-S
Page 1: ...SCC S Sample gas feed unit Operator s Manual 42 23 59 EN Rev 1 ...
Page 35: ...35 Circuit Diagrams SCC S Sample Gas Feed Unit without Peltier Cooler ...
Page 36: ...36 SCC S Sample Gas Feed Unit with Peltier Cooler ...
Page 37: ...37 SCC S Sample Gas Feed Unit 24 VDC Power Supply and Solenoid Valves ...
Page 39: ......