![ABB SACE Emax 2 Installation, Operation And Maintenance Instructions Download Page 23](http://html.mh-extra.com/html/abb/sace-emax-2/sace-emax-2_installation-operation-and-maintenance-instructions_2172023.webp)
ABB | SACE Emax 2
Emax E2.2-E4.2-E6.2 circuit-breakers | 4 - Description
19 | © 2013
ABB |
1SDH001000R0002 - L7804
Continued from the previous page
5. Make sure that signalling device indicates the
DISCONNECT
Figure 38
6. Grip the guide levers of the fixed part and push them until the moving part stops. See
Figure 39
7. Extract the disconnection crank from its housing See Figure 40.
8. Press the lock push-button and insert the crank in the moving part. In this phase the
moving part is still in
DISCONNECT
Figure 40
2
1
Figure 41
Continued on the next page