SEMOD56528-36 v2
Maintenance is very important to improve the availability of the protection system
by detecting failures before the protection is required to operate. There is however
little point in testing healthy equipment and then putting it back into service with
an open terminal, with a removed fuse or open miniature circuit breaker with an
open connection, wrong setting, and so on.
Thus a list should be prepared of all items disturbed during test so that all can be
put back into service quickly and without overlooking something. It should be put
back into service item by item and signed by the responsible engineer.
1MRK 511 425-UEN A
Section 10
Commissioning and maintenance of the fault clearing system
Bay control REC650 2.2 IEC
103
Commissioning manual
Summary of Contents for RELION REC650
Page 1: ...RELION 650 SERIES Bay control REC650 Version 2 2 Commissioning manual ...
Page 2: ......
Page 12: ...6 ...
Page 22: ...16 ...
Page 26: ...20 ...
Page 50: ...44 ...
Page 54: ...48 ...
Page 110: ...104 ...
Page 118: ...112 ...
Page 128: ...122 ...
Page 129: ...123 ...