![ABB PST30 Installation And Maintenance Manual Download Page 57](http://html1.mh-extra.com/html/abb/pst30/pst30_installation-and-maintenance-manual_3390451057.webp)
Chapter 7
Settings and configuration
First sequence parameters (1st Seq .Param.)
To set parameters related to the first sequence, enter the 1st Seq. Param. group.
Following parameters can be adjusted:
1st Set Ie
Setting current.
Start Ramp1
Ramp time for start.
Init Volt1
Initial voltage.
Curr Lim1
Current limit level.
Press
Store
to save the selected parameter.
Second sequence parameters (2nd Seq .Param.)
To set parameters related to the second sequence, enter the 2nd Seq. Param. group.
The following parameters can be adjusted:
2nd Set Ie
Setting current.
Start Ramp2
Ramp time for start.
Init Volt2
Initial voltage.
Curr Lim2
Current limit.
Press
Store
to save the selected parameter.
Third sequence parameters (3rd Seq .Param.)
To set parameters related to the third sequence, enter the 3rd Seq. Param. group.
The following parameters can be adjusted:
3rd Set Ie
Setting current.
Start Ramp3
Ramp time for start.
Init Volt3
Initial voltage.
Curr Lim3
Current limit.
Press
Store
to save the selected parameter.
Information!
For wiring and operation of the start/stop signals, see Chapter 5, “Connection” under
programmable inputs.
Low Voltage Products & Systems
7.19
ABB nc. • 888-385-1221 • www.abb-control.com
1SXU 132 021 M0201
7