Post-lubrication
Post-lubrication is required. The post-lubrication time starts when the engine shaft is stationary.
Stop the engine
Observe the oil pressure specified for post-lubrication (see Table
Run oil pump as soon as the pump driven by the engine does not generate sufficient oil
pressure.
Power2
Post-lubrication time
850 LP
at least 30 min.
850 HP
at least 1.5 h or until turbine inlet temperature <180 °C
Table 2: Post-lubrication time
3.1.3
Oil filtering
Power2
Filter mesh width [mm]
850
≤ 0.034
Table 3
3.1.4
Oil pressure
Comply precisely with the oil pressure before the low-pressure and high-pressure stage for
trouble-free operation.
The admissible values are specified in chapter
Monitoring during operation [➙
3.1.5
Oil orifice
Metering orifices are installed in the oil inlet of the low-pressure stage and the high-pressure
stage in order to safeguard the oil pressures.
3.2
Inspection procedures
3.2.1
Introduction
Inspection procedures include preventative visual controls, monitoring and measuring work
before and during commissioning. Inspection procedures enable changes to the low and high-
pressure stage to be detected. Engine damage can be prevented.
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......