The templates available in the folder appear in the
List of Templates
section.
3.
Select a template file to preview the display pages available in the template file.
4.
Once the display pages are selected, click
Import
to import the display page.
Multiple pages can be selected for the
Import
function.
5.6
Using IEC 61850 Configuration
The IEC 61850 Configuration tool is used for GOOSE and client-server data flow
engineering between IEDs in a substation.
1.
In
Plant Structure
, right-click
Substation
,
Voltage Level
,
Bay
,
IED Group
or
IED
, and then select
IEC 61850 Configuration
.
2.
On the toolbar, select the configuration mode.
•
GOOSE Communication
•
Client-Server Communication
Different parts of the IEC 61850 configuration can be edited depending on the
selected configuration mode.
3.
Click one of the tabs on bottom of the tool window to select the type of the
configured data.
•
Data Sets
•
GOOSE Controls
•
Inputs
•
Report Controls
The type of the data available depends on the current configuration mode.
5.6.1
Sending and receiving data
In the Data Sets, GOOSE Controls, Report Controls and Sampled Value Controls tabs,
it is possible to configure the sending or receiving of data. A check mark in the matrix
means that the data on the row is sent to or received by the client in the column.
•
To send or receive data, select a check box in the mapping matrix.
•
To send data to all receivers, right-click the data to be sent and select
Send to
All
.
•
To receive all data, right-click a receiver and select
Receive All
.
•
To receive the same data as another IED, right-click a receiver, select
Receive
Same Data As
and select an access point from the pop-up menu.
Section 5
1MRS757866 C
Use cases for engineering and commissioning
54
PCM600
Getting Started Guide