Page 5
© 2021 ABB. All rights reserved.
Quick Start Guide
Step 6
-
Connect Loads (Outputs)
(continued)
4. Repeat for additional Load Breakers.
Connect Loads (Outputs)
1. Connect load return wire to the Load Return Bus
-
M6 lug
(not provided).
2.Connect load wire to breaker.
a. Strip load wire to 10 mm
(3/8”).
b. Insert load wire into breaker load wire connection along
side the alarm wire.
Load
Return Bus
Load Return Connection
Alarm wire:
secure with the
load wire
Breaker
Load
Connection
Screw
Breaker Bus
Connection
Screw
Bus Tabs
DIN Rail
Step 7
-
Label Connections
ID label is in front of the breakers or on the door.
Mark each connected circuit identification on the ID label
ID Label Example
Step 8
-
Connect Controller Cables
For additional details, see Steps 11 and 12 for controller information, and Information Sections on battery
monitoring and alarm connections.
1. Connect LAN (10Base
-
T Ethernet) Communication.
2. Connect 1
-
Wire Battery Monitoring Cables.
3. Connect alarm input and output cables.
Alarm Relay Jumpers
LAN
Alarm Outputs
Alarm Inputs
Thermal
Slide the unit into the power slot approximately
3/4 of the way.
Step 9
-
Install Rectifiers
Open the faceplate by sliding the
faceplate latch to the left until the
faceplate releases and swings
outward.
Slide the unit into the slot until it engages
with the back of the shelf. Swing the
faceplate closed to fully seat the rectifier.
Verify the faceplate is latched.